Countertop installation and replacement cost
Hiring a carpenter or installer: about $3,250–$8,850 at US average labor rates for the most common type (Quartz, fabricated slab, 50 square feet). Pick the type, size and your state below.
Hire a pro
Quartz, fabricated slab, 50 square feet, US average
$3,250–$8,850
This type is a job for a licensed pro, so the figure above is the hired price.
| Equipment and materials | $2,750–$7,500 |
|---|---|
| Labor | $530–$1,350 7.5–12.5 h at $70–$105 an hour |
| Other charges Tear-out and disposal of the old countertop (if ticked), disconnect and reconnect sink and faucet (if ticked), extra cutout or undermount sink opening (some types) (if ticked) | $0–$0 |
| Parts only, if you do it yourself | Not a DIY job |
An estimate, not a quote. Sales tax, permits beyond those listed and surprises found once work starts are not included. How we calculate.
- The job
- Square foot of kitchen countertop, templated, delivered and set on existing base cabinets with one sink cutout; tear-out of the old top and plumbing reconnection are separate lines
- Who does it
- A carpenter or installer. BLS mean wage $31.55 an hour; contractors bill $70–$105.
- Do it yourself
- 3 of 5
- Permit
- Not usually required to replace countertops on existing cabinets; moving plumbing or wiring can need one.
- Lifespan
- InterNACHI lists laminate countertops at 20–30 years and natural stone and wood at 100+ years.
Countertop installation cost by type
US average labor rates, 50 square feet. Hired price includes equipment and labor. Not included unless needed: tear-out and disposal of the old countertop, $50–$750; disconnect and reconnect sink and faucet, $150–$400; extra cutout or undermount sink opening, $100–$300. Numbers in brackets link to the sources.
| Type | Hired | Parts retail per square foot | Labor per square foot | DIY parts |
|---|---|---|---|---|
| Quartz, fabricated slab Usually sold installed; material here is the fabricated price split from installed quotes using Homewyse and Thumbtack. | $3,250–$8,850 | $55–$120 [13][1][5] | 0.15–0.25 h [1] | Pro only |
| Granite, fabricated slab Usually sold installed; material here is the fabricated price split from installed quotes using Homewyse and Thumbtack slab grades. | $2,500–$7,600 | $40–$100 [14][2] | 0.15–0.25 h [2] | Pro only |
| Laminate, prefab or custom Prefab 8 ft lengths cost about $9–$16 per sq ft; custom post-formed tops cost 25%–100% more. | $710–$2,500 | $10–$30 [11][12][10] | 0.06–0.12 h [3] | $500–$1,500 |
| Butcher block Includes sealing or oiling; walnut and other hardwoods cost more. | $1,100–$5,100 | $15–$60 [11][12][6][4] | 0.1–0.25 h [4][6] | $750–$3,000 |
| Solid surface Sheet material is priced before fabrication. Hours are HomeGuide's $20–$70 per sq ft fabrication and installation divided by our carpenter billing rate, so this is the least certain option. | $1,950–$7,450 | $25–$65 [16][17][7] | 0.2–0.65 h [16] | Pro only |
Parts vs labor
Most common type (Quartz, fabricated slab): equipment and materials $2,750–$7,500, labor $530–$1,350 (7.5–12.5 hours).
For granite and quartz, the slab is most of the bill. Fabricators usually sell stone installed, so the per square foot material price here is the fabricated price (cut, edged and polished), split from installed quotes using Homewyse's material line ($79–$109 for granite, $94–$119 for quartz) and Thumbtack's slab grades. On-site setting takes about 0.17–0.18 person-hours per square foot in Homewyse's data, so a two-person crew sets a 50 sq ft kitchen in about half a day after a separate template visit.
Laminate and butcher block are cheaper to buy, so labor is a bigger share. Fixr puts laminate labor at $10–$30 per square foot, or about a third of the installed price, and Bob Vila says butcher block labor is 30%–50% of the total.
What drives the price
- Material. Prefab laminate runs about $9–$16 per square foot at Home Depot, butcher block $11–$70, granite slab $40–$100 by grade, and quartz $50–$150. Material is the largest share of every stone job.
- Stone grade and color. Thumbtack lists level 1 granite at $40–$50 per square foot and level 5 at $75–$100; rare colors such as blue start above $100.
- Cutouts. One sink cutout is usually included. Extra openings for cooktops or soap dispensers run $100–$200 each per Fixr, and Thumbtack lists about $35 for an outlet cutout in a quartz backsplash.
- Edges. A square or eased edge often costs nothing extra; bullnose, ogee and Dupont profiles add about $5–$60 per linear foot.
- Tear-out and plumbing. Pulling the old top costs $50–$300 per Fixr and up to $5–$15 per square foot per Bob Vila for stone, and the sink and faucet need to be disconnected and reconnected, about $150–$400.
DIY or hire a pro
Prefab laminate and butcher block are realistic DIY jobs. The tops come in 6 to 12 ft lengths, and a homeowner with a circular saw, jigsaw and clamps can cut them to length, cut a drop-in sink opening and screw them down from below. Miter joints for L-shaped runs are the hard part; Home Depot sells laminate kits with factory-cut miters.
Granite, quartz and solid surface are fabricator jobs in practice. A 50 sq ft kitchen in 3 cm stone weighs well over 500 lb, slabs crack if carried flat, and undermount sink openings are cut with water-cooled saws in the shop. Most fabricators will not sell an uninstalled slab cut to size.
Replace or repair
InterNACHI lists laminate countertops at 20–30 years and natural stone and wood at 100+ years, so stone and wood tops are usually replaced for looks or a remodel, not because they wore out. Butcher block can be sanded and re-oiled, and chips in granite and quartz can be filled with color-matched epoxy.
Laminate cannot be refinished. Once the surface layer is burned, delaminating at the edges or swollen around the sink from water getting into the particleboard core, replacement is the usual fix.
Signs it needs replacing
- Laminate is peeling at the seams or edges, or the core has swollen near the sink.
- The surface has deep burns, cuts or stains that sanding or polishing cannot remove.
- Stone has cracked across a seam or near the sink cutout.
- The top no longer fits a new sink, cooktop or cabinet layout.
How our range compares with published estimates
Figures as each site published them, for the job and size they state. We show them for comparison; they are not inputs to our model. Ours: $3,250–$8,850 (Quartz, fabricated slab, 50 square feet).
| Source | Published figure | What it covers |
|---|---|---|
| Homewyse | $120–$157 | Quartz countertop installed, per square foot (May 2026) |
| Bob Vila | $1,500–$12,000 | Quartz countertops installed, whole kitchen |
| Fixr | $1,600–$6,000 | Kitchen countertops replaced, 40 sq ft, all materials |
| Thumbtack | $1,214–$3,884 | Quartz countertop installed, national average job |
Countertop installation cost by state
Hired price, Quartz, fabricated slab, 50 square feet. Labor scales with each state's BLS mean wage for carpenters (SOC 47-2031); equipment prices are national.
Show all 51 states
| State | Hired price | Labor rate |
|---|---|---|
| Alabama | $3,150–$8,550 | $55–$85/h |
| Alaska | $3,400–$9,100 | $85–$130/h |
| Arizona | $3,200–$8,700 | $60–$95/h |
| Arkansas | $3,150–$8,550 | $55–$85/h |
| California | $3,350–$9,100 | $85–$130/h |
| Colorado | $3,250–$8,850 | $70–$110/h |
| Connecticut | $3,300–$8,900 | $70–$110/h |
| Delaware | $3,250–$8,750 | $65–$100/h |
| District of Columbia | $3,250–$8,850 | $70–$105/h |
| Florida | $3,150–$8,550 | $55–$85/h |
| Georgia | $3,150–$8,550 | $55–$85/h |
| Hawaii | $3,400–$9,200 | $90–$140/h |
| Idaho | $3,200–$8,650 | $60–$90/h |
| Illinois | $3,400–$9,100 | $85–$130/h |
| Indiana | $3,250–$8,800 | $70–$105/h |
| Iowa | $3,200–$8,650 | $60–$95/h |
| Kansas | $3,200–$8,700 | $60–$95/h |
| Kentucky | $3,150–$8,600 | $55–$90/h |
| Louisiana | $3,150–$8,550 | $55–$85/h |
| Maine | $3,250–$8,800 | $65–$105/h |
| Maryland | $3,300–$8,900 | $70–$110/h |
| Massachusetts | $3,350–$9,100 | $85–$130/h |
| Michigan | $3,250–$8,750 | $65–$100/h |
| Minnesota | $3,300–$8,900 | $75–$115/h |
| Mississippi | $3,150–$8,550 | $55–$85/h |
| Missouri | $3,250–$8,800 | $70–$105/h |
| Montana | $3,200–$8,700 | $60–$95/h |
| Nebraska | $3,150–$8,600 | $55–$90/h |
| Nevada | $3,300–$8,900 | $70–$110/h |
| New Hampshire | $3,250–$8,800 | $65–$105/h |
| New Jersey | $3,300–$8,950 | $75–$115/h |
| New Mexico | $3,200–$8,650 | $60–$95/h |
| New York | $3,350–$9,050 | $80–$125/h |
| North Carolina | $3,150–$8,550 | $55–$85/h |
| North Dakota | $3,200–$8,700 | $60–$95/h |
| Ohio | $3,250–$8,750 | $65–$100/h |
| Oklahoma | $3,150–$8,550 | $55–$85/h |
| Oregon | $3,300–$8,950 | $75–$115/h |
| Pennsylvania | $3,250–$8,800 | $65–$105/h |
| Rhode Island | $3,250–$8,800 | $65–$105/h |
| South Carolina | $3,150–$8,600 | $55–$90/h |
| South Dakota | $3,150–$8,550 | $55–$85/h |
| Tennessee | $3,150–$8,600 | $55–$90/h |
| Texas | $3,150–$8,550 | $55–$85/h |
| Utah | $3,150–$8,600 | $55–$90/h |
| Vermont | $3,250–$8,750 | $65–$100/h |
| Virginia | $3,150–$8,600 | $55–$90/h |
| Washington | $3,350–$9,100 | $85–$130/h |
| West Virginia | $3,150–$8,550 | $55–$85/h |
| Wisconsin | $3,250–$8,800 | $70–$105/h |
| Wyoming | $3,200–$8,700 | $60–$95/h |
Questions
- How much does it cost to install a quartz countertop?
Bob Vila puts quartz at $50–$200 per square foot installed, about $125 on average, and Homewyse's May 2026 national figure is $120–$157. Thumbtack lists quartz slab at $54–$72 per square foot and a sink cutout at about $300. A typical 35–50 sq ft kitchen lands around $3,000–$8,000.
- What does granite countertop cost per square foot?
Thumbtack lists granite slab at $40–$50 per square foot for level 1 stone and $75–$100 for level 5. Homewyse's May 2026 installed figure is $96.58–$141 per square foot, and Fixr gives $40–$150.
- How much does it cost to install laminate countertops?
Fixr puts installed laminate at $15–$60 per square foot, about $30 on average, or $750–$3,000 for 50 sq ft. Home Depot's prefab 8 ft laminate tops run about $149–$264, and Fixr lists labor at $10–$30 per square foot. Replacing old tops adds $50–$300 for removal.
- How much does it cost to install a backsplash?
Bob Vila puts a kitchen backsplash at $600–$1,300, about $1,000 on average, or $15–$45 per square foot installed. Ceramic and porcelain tile cost $2–$6 per square foot, and removing an old backsplash adds $3–$6 per square foot.
Related costs
- Kitchen remodel cost$15,900–$45,900
- Bathroom vanity installation and replacement cost$580–$1,950
- Dishwasher installation and replacement cost$710–$2,000
- Garbage disposal replacement cost$190–$450
- Bathroom remodel cost$8,500–$22,300
More interior and remodel costs
- Carpet replacement and installation cost$1,950–$5,750
- Hardwood floor installation and replacement cost$4,050–$8,150
- Hardwood floor refinishing cost$1,600–$3,150
- Laminate flooring installation and replacement cost$2,450–$5,800
- Tile floor installation and replacement cost$1,750–$4,850
- Vinyl plank flooring installation and replacement cost$2,250–$6,200
- Walk-in shower installation cost$2,150–$6,350
- Walk-in tub cost$3,300–$9,700
Sources
- Homewyse: Cost to Install Quartz Countertop. Calculator data: 0.1713 labor hours per sq ft to install a fabricated quartz top (basic labor includes 1 sink and faucet cutout); quartz countertop material $94.40–$119.36 per sq ft; removal of the old top 0.0287 hours per sq ft; national $120–$157 per sq ft installed, May 2026. Checked 2026-11-29.
- Homewyse: Cost to Install Granite Countertops. Calculator data: 0.1775 labor hours per sq ft; granite countertop material $78.69–$109.14 per sq ft; national $96.58–$141 per sq ft installed, May 2026. Checked 2026-11-29.
- Homewyse: Cost to Install a Laminate Countertop. Calculator data: 0.0800 labor hours per sq ft; laminate countertop material $31.93–$44.29 per sq ft; national $41.94–$63.77 per sq ft installed, May 2026. Checked 2026-11-29.
- Homewyse: Cost to Install Butcher Block Countertop. Calculator data: 0.1040 labor hours per sq ft; butcher block material $50.10–$69.49 per sq ft; national $67.08–$94.27 per sq ft installed, May 2026. Checked 2026-11-29.
- Bob Vila: How Much Do Quartz Countertops Cost?. $50–$200 per sq ft installed, about $125 average; total $1,500–$12,000; labor $10–$30 per sq ft; builder-grade quartz $65–$75 per sq ft; tear-out $5–$15 per sq ft; plumbing disconnect and reconnect $150–$400; edges $5–$60 per linear ft. Checked 2026-11-29.
- Bob Vila: Butcher Block Countertops Cost. Material $20–$70 per sq ft; $50–$100 per sq ft installed; $2,000–$5,000 for a 50 sq ft kitchen; labor 30%–50% of the total; a pro team needs about a full day. Checked 2026-11-29.
- Bob Vila: Corian countertops cost. Solid surface usually $35–$85 per sq ft (not stated whether installed). Checked 2026-11-29.
- Bob Vila: Backsplash Installation Cost. $600–$1,300, about $1,000 average; $15–$45 per sq ft installed; ceramic $2 and porcelain $3–$6 per sq ft material; removal of an old backsplash $3–$6 per sq ft. Checked 2026-11-29.
- Fixr: Cost to replace kitchen countertops. Updated January 2026: laminate $15–$60, butcher block $40–$100, granite $40–$150, quartz $50–$200+, solid surface $40–$100 per sq ft; 35 sq ft quartz kitchen $1,400–$5,250, about $3,000; removal $50–$300; cutouts $100–$200 per opening. Checked 2026-11-29.
- Fixr: Laminate countertop cost. Updated January 2026: installed $15–$60 per sq ft, about $30; 50 sq ft $750–$3,000; standard laminate material $10–$18 per sq ft; custom 25%–100% more than prefab; labor $30–$40 per hour or $10–$30 per sq ft; removal $50–$300. Checked 2026-11-29.
- Home Depot: 8 ft laminate and butcher block countertops (search-result snippets). Search-result snippets showed Hampton Bay 8 ft laminate countertops at $149–$264 (straight with backsplash to mitered kit), about $9–$16 per sq ft at 25 in deep, and 8 ft butcher block tops at about $179–$419. Checked 2026-11-29.
- IKEA: Kitchen countertops. Laminate 74 in and 98 in tops $79–$159 (25 5/8 in deep, about $6–$10 per sq ft); oak and walnut veneer wood tops 74 in $199–$279 (about $15–$21 per sq ft). Checked 2026-11-29.
- Thumbtack: How much are quartz countertops?. $74–$99 per sq ft installed; slab $54–$72 per sq ft (good $50–$65, better $65–$75, best $75–$150+); sink cutout $300; outlet cutout $35; national average job $1,214–$3,884. Checked 2026-11-29.
- Thumbtack: Granite countertops cost. Slab grade level 1 $40–$50 and level 5 $75–$100 per sq ft; slab format $45–$65 per sq ft; sink cutout about $100; average job $986–$3,311. Checked 2026-11-29.
- Thumbtack: Cost to install countertops. Removing existing counters about $9 per sq ft; national average job $1,116–$3,652. Checked 2026-11-29.
- HomeGuide: Corian countertops cost (search-result snippet). Search-result snippet: $50–$150 per sq ft installed; materials $30–$80 per sq ft; fabrication and installation $20–$70 per sq ft. Checked 2026-11-29.
- Angi: Corian countertops cost (search-result snippet). Search-result snippet: Corian materials $26–$65 per sq ft depending on design. Checked 2026-11-29.
- InterNACHI: Standard Estimated Life Expectancy Chart for Homes. Countertops: laminate 20 to 30 years; natural stone, tile and wood 100+ years; cultured marble 20 years. Checked 2026-11-29.
- BLS Occupational Employment and Wage Statistics, May 2025: Carpenters (SOC 47-2031), mean hourly wage by state. Fetched 2026-11-29.